{"id":1376,"date":"2023-08-25T13:53:14","date_gmt":"2023-08-25T10:53:14","guid":{"rendered":"https:\/\/www.melismadencilik.com\/ekenler-madencilik\/"},"modified":"2023-11-26T02:15:38","modified_gmt":"2023-11-25T23:15:38","slug":"ekenler-mining","status":"publish","type":"post","link":"https:\/\/www.melismadencilik.com\/en\/ekenler-mining\/","title":{"rendered":"Ekenler Mining"},"content":{"rendered":"<p>In the chrome mine project in the Ula\u015f region of Sivas, we offer modern installations and additional transformer support. Details of this project are listed below:<\/p>\n<h2>Ekenler Mining Installation:<\/h2>\n<p>* 12 pcs shaking table<br \/>\n* 1 dragon table<br \/>\n* 1 piece of grinder<br \/>\n* 3 sieves<br \/>\n* 1 hydrosizer<br \/>\n* 6 mud pumps<br \/>\nThese modern installations have been carefully implemented to make the operation of the chrome mine more efficient and increase productivity.<\/p>\n<h2><a href=\"https:\/\/www.facebook.com\/ekenlermadencilik\/?locale=tr_TR\" target=\"_blank\" rel=\"noopener\">Ekenler Mining<\/a><a> Transformer Installation:<\/a><\/h2>\n<p>Within the scope of the project, a transformer was installed to meet the power requirements of the facility and to regulate the electric current. This transformer will effectively meet the energy needs of the facility and ensure uninterrupted operation of the facility.<\/p>\n<p>Sivas Ula\u015f Chrome Mine project aims to make the operation of the mine more efficient and reliable with modern installations and transformer support. With the <a href=\"https:\/\/www.melismadencilik.com\/elektrik-ic-dis-tesisat-ve-otomasyon\/\">transformer installation<\/a> we provided in the project, we contributed to the uninterrupted and safe operation of the facility by increasing its energy supply and regulation capabilities.<br \/>\nElectrical and automation, technical and training support was provided.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In the chrome mine project in the Ula\u015f region of Sivas, we offer modern installations and additional transformer support. Details of this project are listed below: Ekenler Mining Installation: * 12 pcs shaking table * 1 dragon table * 1 piece of grinder * 3 sieves * 1 hydrosizer * 6 mud pumps These modern [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1190,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[15],"tags":[],"class_list":["post-1376","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.melismadencilik.com\/en\/wp-json\/wp\/v2\/posts\/1376","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.melismadencilik.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.melismadencilik.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.melismadencilik.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.melismadencilik.com\/en\/wp-json\/wp\/v2\/comments?post=1376"}],"version-history":[{"count":7,"href":"https:\/\/www.melismadencilik.com\/en\/wp-json\/wp\/v2\/posts\/1376\/revisions"}],"predecessor-version":[{"id":1791,"href":"https:\/\/www.melismadencilik.com\/en\/wp-json\/wp\/v2\/posts\/1376\/revisions\/1791"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.melismadencilik.com\/en\/wp-json\/wp\/v2\/media\/1190"}],"wp:attachment":[{"href":"https:\/\/www.melismadencilik.com\/en\/wp-json\/wp\/v2\/media?parent=1376"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.melismadencilik.com\/en\/wp-json\/wp\/v2\/categories?post=1376"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.melismadencilik.com\/en\/wp-json\/wp\/v2\/tags?post=1376"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}