{"id":1384,"date":"2023-08-25T13:52:50","date_gmt":"2023-08-25T10:52:50","guid":{"rendered":"https:\/\/www.melismadencilik.com\/gurak-madencilik\/"},"modified":"2023-11-26T02:15:06","modified_gmt":"2023-11-25T23:15:06","slug":"gurak-mining","status":"publish","type":"post","link":"https:\/\/www.melismadencilik.com\/en\/gurak-mining\/","title":{"rendered":"G\u00fcrak Mining"},"content":{"rendered":"<p>We present the modern installations and electrical automation support we provided in the chrome mine project in <a href=\"https:\/\/www.fethiye.bel.tr\/\" target=\"_blank\" rel=\"noopener\">Fethiye<\/a>, Mugla. Details of this project are listed below:<\/p>\n<h2>G\u00fcrak Mining Installation:<\/h2>\n<p>* 24 pcs shaking table<br \/>\n* 1 dragon table<br \/>\n* 2 mills<br \/>\n* 2 sieves<br \/>\n* 3 hydrosizer<br \/>\n* 6 mud pumps<br \/>\nThese modern installations have been meticulously carried out to make the operation of the chrome mine more efficient and increase productivity.<\/p>\n<h2>G\u00fcrak Mining Electrical Automation Support:<\/h2>\n<p>In the project, <a href=\"https:\/\/www.melismadencilik.com\/en\/elektrik-ic-dis-tesisat-ve-otomasyon\/\">electrical automation support<\/a> was provided to ensure more effective and smooth operation of the plant. The electrical automation system was meticulously designed and implemented to ensure reliable and efficient operation of the plant.<\/p>\n<p>The Mu\u011fla Fethiye Chrome Mine project aims to make the operation of the mine more efficient with modern installations and electrical automation support. We are pleased to highlight the project&#8217;s role in achieving the goals of improving the plant&#8217;s performance and optimizing efficiency.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>We present the modern installations and electrical automation support we provided in the chrome mine project in Fethiye, Mugla. Details of this project are listed below: G\u00fcrak Mining Installation: * 24 pcs shaking table * 1 dragon table * 2 mills * 2 sieves * 3 hydrosizer * 6 mud pumps These modern installations have [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1190,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[23],"tags":[],"class_list":["post-1384","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projeler-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.melismadencilik.com\/en\/wp-json\/wp\/v2\/posts\/1384","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.melismadencilik.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.melismadencilik.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.melismadencilik.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.melismadencilik.com\/en\/wp-json\/wp\/v2\/comments?post=1384"}],"version-history":[{"count":6,"href":"https:\/\/www.melismadencilik.com\/en\/wp-json\/wp\/v2\/posts\/1384\/revisions"}],"predecessor-version":[{"id":1786,"href":"https:\/\/www.melismadencilik.com\/en\/wp-json\/wp\/v2\/posts\/1384\/revisions\/1786"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.melismadencilik.com\/en\/wp-json\/wp\/v2\/media\/1190"}],"wp:attachment":[{"href":"https:\/\/www.melismadencilik.com\/en\/wp-json\/wp\/v2\/media?parent=1384"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.melismadencilik.com\/en\/wp-json\/wp\/v2\/categories?post=1384"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.melismadencilik.com\/en\/wp-json\/wp\/v2\/tags?post=1384"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}